• Welcome to The Building Code Forum

    Your premier resource for building code knowledge.

    This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.

    Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.

    Ready to upgrade? Log in and upgrade now.

Linen closet requirements

SCBO1

REGISTERED
Joined
Oct 28, 2009
Messages
4,610
Location
MID WEST
I'm looking for linen closet construction requirements, I thought there was some requirements like a 1-HR wall requirement and or a sprinkler requirement? Code section?

pc1
 
Pcinspector,

Are you possibly referring to "Incidental Storage Areas"?

TABLE 508.2 INCIDENTAL USE AREAS

ROOM OR AREA

SEPARATION AND/OR PROTECTION

Furnace room where any piece of equipment is over 400,000 Btu per hour input

1 hour or provide automatic fire-extinguishing system

Rooms with boilers where the largest piece of equipment is over 15 psi and 10 horsepower

1 hour or provide automatic fire-extinguishing system

Refrigerant machinery rooms

1 hour or provide automatic sprinkler system

Parking garage (:Next('./icod_ibc_2006f2_4_sec006_par005.htm')'>Section 406.2)

2 hours; or 1 hour and provide automatic fire-extinguishing system

Hydrogen cut-off rooms, not classified as Group H

1-hour in Group B, F, M, S and U occupancies. 2-hour in Group A, E, I and R occupancies.

Incinerator rooms

2 hours and automatic sprinkler system

Paint shops, not classified as Group H, located in occupancies other than Group F

2 hours; or 1 hour and provide automatic fire-extinguishing system

Laboratories and vocational shops, not classified as Group H, located in Group E or I-2 occupancies

1 hour or provide automatic fire-extinguishing system

Laundry rooms over 100 square feet

1 hour or provide automatic fire-extinguishing system

Storage rooms over 100 square feet

1 hour or provide automatic fire-extinguishing system

Group I-3 cells equipped with padded surfaces

1 hour

Group I-2 waste and linen collection rooms

1 hour

Waste and linen collection rooms over 100 square feet

1 hour or provide automatic fire-extinguishing system

Stationary storage battery systems having a liquid capacity of more than 100 gallons used for facility standby power, emergency power or uninterrupted power supplies

1-hour in Group B, F, M, S and U occupancies. 2-hour in Group A, E, I and R occupancies.

.
 
Last edited by a moderator:
Globe,

Just wanted to make sure I did'nt miss something, the plans appear to be compliant, closets not rooms. I thought I had seen something on linen closets but could not find it!

Under the square footage requirement.

Thanks

pc1
 
Globe,

52 s.f. with one pendent sprinkler, 5/8" fire shield, mold resistant drywall. I think its good to go.

pc1
 
Back
Top