chuck Miller
Member
I have come across several "new construction" jobs where there is no fastener from column plate to beam or just 1 nail. I thought that a minimum of 2 bolts were required at the plate, and if it was the end of a beam (like at a stair well) that 4 bolts were needed. Bur I can't find this in the IRC. 602 tables have all kind of other applications and 502.5 is span info. Can some one point me to the proper section? TIA.