Hyrax4978
REGISTERED
I have a renovation to a commercial building of type 5B construction that is just about wrapping up. The local building official said he "thought" the mechanical room had to be rated. I don't see anywhere that it says that. checked with the mechanical engineer also and he agreed that he didn't see anyplace it would need to be rated in the code. When we asked the B.O. for a code section and he didn't have one the building official asked for a letter signed and stamped that stating the mechanical room definitely does not need to be rated. We have a 10 ton, electric air handler so there is no combustion in the mechanical room.
Am i missing something. I don't see anyplace in the code to trigger rating the room. Anyone else out there find a place to require the mechanical room to be rated with this type of equipment in there.
CT 2018 which is based on the IBC 2015.
Thank you!
Am i missing something. I don't see anyplace in the code to trigger rating the room. Anyone else out there find a place to require the mechanical room to be rated with this type of equipment in there.
CT 2018 which is based on the IBC 2015.
Thank you!