jar546
CBO
There is one major change to the already published NFPA 70, aka National Electrical Code (NEC) that was so important they came out with a TIA on it (Tentative Interim Amendment) which essentially changes the existing code cycle it is issued rather than waiting until the next one.
I would make sure that you always print the TIA's and place them in your books. Here it is and below is a link to TIAs:
https://www.nfpa.org/codes-and-stan...ds/list-of-codes-and-standards/detail?code=70
I would make sure that you always print the TIA's and place them in your books. Here it is and below is a link to TIAs:
https://www.nfpa.org/codes-and-stan...ds/list-of-codes-and-standards/detail?code=70