Trying to make a determination on the building occupancy of structural metal painting facility. The differentiation between H-2 and H3 includes descriptions of either a closed or open system. I want to assume the system being used is closed (seems pretty closed to me) but I wondered if I might get some consensus from others with more experience. We've never done an H occupancy in our office.
The system being used is a Voortman VP. Additionally, there will be a smaller room with a pre-fabricated automotive paint booth in it. Not sure the exact model.
Please and thank you.
Trying to make a determination on the building occupancy of structural metal painting facility. The differentiation between H-2 and H3 includes descriptions of either a closed or open system. I want to assume the system being used is closed (seems pretty closed to me) but I wondered if I might get some consensus from others with more experience. We've never done an H occupancy in our office.
The system being used is a Voortman VP. Additionally, there will be a smaller room with a pre-fabricated automotive paint booth in it. Not sure the exact model.
Please and thank you.