I'm working on a single story dental office, Type VB Construction, non sprinklered.
The plan reviewer made a comment that the corridor walls need to be 1 hr rated. This wouldn't normally be a problem however each of the treatment rooms are located along the corridor. The entry to each treatment room is an opening with no door. So my question is is it possible to still have a rated corridor with "door opening" for the treatment rooms?
The plan reviewer made a comment that the corridor walls need to be 1 hr rated. This wouldn't normally be a problem however each of the treatment rooms are located along the corridor. The entry to each treatment room is an opening with no door. So my question is is it possible to still have a rated corridor with "door opening" for the treatment rooms?