Originally a 2X4 wall with 2" pvc running through the stud.
I issued a red tag. Install stud shoe.
Here is what they did!
The contractor added a 2X6 beside the 2X4 and drilled through the 2X6.
Issued another red tag. Contractor asked.... Why? It's not over bored!
What is the answer?