• Welcome to the new and improved Building Code Forum. We appreciate you being here and hope that you are getting the information that you need concerning all codes of the building trades. This is a free forum to the public due to the generosity of the Sawhorses, Corporate Supporters and Supporters who have upgraded their accounts. If you would like to have improved access to the forum please upgrade to Sawhorse by first logging in then clicking here: Upgrades

Panelmate Installation (Hurricane Shutters)

nickb1236

Registered User
Joined
Sep 21, 2017
Messages
4
Location
Orlando, FL
I want to flush mount female panelmates for hurricane panel installation (in concrete block / stucco), but am not sure how to set the PMD-1 combo drill bit for countersinking.

Does it go like this, with a countersink for just the top of the hex head:
https://imgur.com/a/mTsnS

Or like this, with a countersink for the entire non-threaded portion:
https://imgur.com/a/p1SEz

In the first case, I wonder if I'd have trouble driving the head all the way in. in the second case, it seems the non-threaded portion below the hex head would be loose, since the
countersink is larger than it is.

Anyone know how this goes?

Here are the Elco instructions, in case they may be useful:

https://imgur.com/a/MSRQv

Thanks for the help!
 
Sounds like use what is recommended

Get a cmu block or similar and practice
 
Thanks for the reply. The problem is that I can't tell what is recommended; it's not apparent in the instructions. I'd be thrilled to follow their recommendations if they made them known!

Getting a block for practice is a good suggestion, but I'm hoping someone out there (esp. in Florida!) already knows the answer to save me a trip to pick one up.
 
Top