ICE

MODERATOR
Staff member
Joined
Jun 23, 2011
Messages
13,804
Location
California
Everywhere you look there's a blob of foam. And yes, the work was approved by an inspector. The cable is landed on circuit breakers that are in an energized service panel.
24748974509_54298f959e_b.jpg



I could see the nail shank behind the blob that was here. So now I am going to ask them to remove all of the foam so I can look for more nails. There plenty of shiners and it is strange that the sheathing was nailed after the electrical was done.

I changed up the correction. It is now "Start over and leave the existing cable in place".

25090333686_6e5ae79d06_b.jpg



There is a service upgrade located on the addition and this is the old location. This mess is energized and the service has been connected by Edison. The service has been signed off on the job card.

25090350856_d2588dbbd7_b.jpg



The rods are just over 4" apart.

25145804276_ebe04645bb_b.jpg
 