Inspector 102
REGISTERED
The local high school has identified a gas leak in the underground piping serving their lab stations in the chemistry class. They have proposed installing a 20# portable tank in the classroom with emergency shut-off valving to eliminate the underground portion until the school is closed long enough to tear up a floor and repair/replace. Having concerns and wanted the experts to chime in on code restrictions that need to be considered for this to happen, if it even can. The tank would supply basically 8 valve locations used for Bunsen burners with a control valve attending to by the teacher. the time frame they are asking for is about 4 months.
Tank storage, valving, labeling, CSST between stations, and fire separation are all concerns. Building built in 1966 and I believe there is 1-hour separation in place for this lab room, but still need to confirm. Any advise or guidance appreciated.
2012 IBC, IMC, IFGC, IFC applicable.
Tank storage, valving, labeling, CSST between stations, and fire separation are all concerns. Building built in 1966 and I believe there is 1-hour separation in place for this lab room, but still need to confirm. Any advise or guidance appreciated.
2012 IBC, IMC, IFGC, IFC applicable.