vegas paul
Silver Member
While PVC is allowed for potable water supply, as soon as it enters the building (and becomes water distribution piping), PVC is not allowed. Of course, for hot water, this is understandable, but how would you feel about allowing PVC for a long stretch inside the building prior to encountering any water-heating system?
I have a renovation of an old (large) building that has 4" PVC supply and the designer wants to continue the 4" PVC for a long run into the building prior to branching off for individual units, which would be piped using CPVC.
The price difference between Schedule 80 PVC vs. CPVC is the driving factor.
Thoughts?
I have a renovation of an old (large) building that has 4" PVC supply and the designer wants to continue the 4" PVC for a long run into the building prior to branching off for individual units, which would be piped using CPVC.
The price difference between Schedule 80 PVC vs. CPVC is the driving factor.
Thoughts?