• Welcome to the new and improved Building Code Forum. We appreciate you being here and hope that you are getting the information that you need concerning all codes of the building trades. This is a free forum to the public due to the generosity of the Sawhorses, Corporate Supporters and Supporters who have upgraded their accounts. If you would like to have improved access to the forum please upgrade to Sawhorse by first logging in then clicking here: Upgrades

Re-roof permit

Kevin Turner

Bronze Member
Joined
Mar 15, 2010
Messages
70
Location
Texas
Just curious about how many jurisdictions there are that require a permit for re-roofing? And if required in your jurisdiction, what kind of inspections are you performing?

Thanks in advance for any feed back
 
Our city by ordinance has exempted re-roof permits. We have had two hail storms this year with the phone ringing like crazy. Questions center around the ice sheild requirement, from insurance companies and contractors. The 2006IRC requires the ice sheild but the previous code official did not require it. You will see that the 2012IRC will allow the old ice sheild to remain and allow a second ice sheild to be installed over the existing sheild .

If I had to do the inspections:

A ladder would have to be provided and possibly fall protection by the roofer or my city. Removal down to sheeting required, felt type underlayment required, replacement of rusty metals, shingle manufacture wants the ridge shingles attached properly against the prevailing wind, flashings, clean-up and business license checks, final inspection.

A previous city I worked for required re-roof permits not for the fees it generates but because their elder population was being ripped off by the storm chasers and shotty workmanship!
 
Last edited by a moderator:
We do require permits. We do a mid-roof after tear off and felt/flashing installation, then a final inspection.
 
One of the jurisdictions I worked for required re-roof permits mostly to verify that the materials matched those permitted through the development ordinance, as the list of approved materials was very limited. The inspectors did a mid-phase inspection, after a complete tear off as multiple layers of anything were not permitted.
 
Last edited by a moderator:
We had a homeowner installing a 3-tab over two 3-tabs and one wood shake roof, Chief said go get'em

No double shingled roofs allowed here, complete tear-off

pc1
 
We are in the hail zone, so a total tear-off is required on any roof. We also amended the IRC to require drip-edge as in the IBC.
 
I have worked in jurisdictions that require an inspection after the sheathing has been approved and the roofing work has begun. I was surprised at the violations that were caught at that inspection.

I have a question. When roofing over an existing asphalt shingle roof, do you require new undelayment, or do you allow the new shingles directly over the old shingles?
 
Last edited by a moderator:
i prefer overpament, versus underpayment , which i am currently not (sic) we don't require permits for reroofs ( don't know why, haven't been here long enough to know all the details) i woudnot reroof over existing shingles personnally, it (imho) shortens the life span of the new roof. poor substrate, exessive heat, etc, etc,
 
Pcinspector1 said:
A previous city I worked for required re-roof permits not for the fees it generates but because their elder population was being ripped off by the storm chasers and shotty workmanship!
This is primarily why we require re-roof permits. We do not perform inspections, but review the requirements with each applicant, and document the involved parties. On average, I would say our permits account for about 50% of the re-roofs performed within our AHJ. Every winter our lines are buzzing with water problems in the walls and ceilings.
 
I have a question. When roofing over an existing asphalt shingle roof, do you require new underpayment, or do you allow the new shingles directly over the old shingles?

ICE, no requirement to install felt between asphalt shingles that I'm aware of. Felt required on the sheeting only. Felt also gives a little weather protection if it was to rain which would protect the sheeting if it's overlapped properly. I don't have a problem with a second layer if you don't let the shingles curl up and you have a flat surface. Even if the shingle have a little curl I have seen roofer axe them out. I would'nt go over two 3-tab shingled roofs personally. In my AHJ a double roof is not allowed per code IRC2006, but someone on another code like the IRC2003 may be allowed to have a double roof.

pc1
 
Papi,

All are good reasons listed to issue permits for re-roofing IMO. Including ice dams.

pc1
 
Our Jurisdiction

We require permits for commercial re roofing.

Residential are not required if replacing like for like.

Residential required if removing say shake and changing to tile, verify DL adequate.

We are in a low wind zone and have no hail issues though.
 
NY Residential Enegry code requires the insulation to be checked if the sheathing is exposed and if required insulated above or below the sheathing. No one wants to do a tear off anymore.
 
Pcinspector1 said:
ICE, no requirement to install felt between asphalt shingles that I'm aware of. Felt required on the sheeting only. Felt also gives a little weather protection if it was to rain which would protect the sheeting if it's overlapped properly.

pc1
Pc1,

I have heard reasons for and against installing underlayment. Manufactures reps. aren't consistent. Some have said that underlayment is always required and some not. When asked if a lack of underlayment could void a warranty, they reply that it depends on the subject defect. I have seen manufactures installation guidelines that show a method called "nesting shingles" if underlayment is to be omitted, with the proviso that local codes may not allow it.

Those same manufacturers produce expensive underlayment that is required, per their product warranty, on high end shingles.

2009IRC:

Section R905 REQUIREMNETS FOR ROOF COVERINGS.

R905.1 ROOF COVERING APPLICATION.

Roof coverings shall be applied in accordance with the applicable provisions of this section and the manufacturers installation instructions.

R905.2 ASPHALT SHINGLES.

The installation of asphalt shingles shall comply with the provisions of this section.

R905.2.2 SLOPE

For roof slopes trom 2" up to 4" pitch, double underlayment is req in accordance with Section R 905.2.7.

R905.2.3 UNDERLAYMENT.

Unless otherwise noted, required underlayment shall conform to ASTM........

R905.2.7 UNDERLAYMENT APPLICATION.

For roof slopes 2" up to 4" pitch, underlayment shall be two layers applied in the following manner........

For roof slopes of 4" pitch and up, underlayment shall be one layer applied in the following manner........

SECTION R907 REROOFING.

R907.1 GENERAL.

Materials and methods of application used in re-covering or replacing an existing roof covering shall comply with the requirements of Chapter 9.

Definitions:

Roof recover. The process of installing an additional roof covering over a prepared existing roof covering without removing the existing roof covering.

A "recover" is the installation of a "roof covering". Apparently, a roof covering is required to have underlayment. Where is the loophole?
 
Last edited by a moderator:
We are in a hail zone so we require a tearoff. With the ice barrier, I have found that it will often destroy the roof deck if you try to remove it so I allow it to remain. If it is dinged up then the contractor can go over it. For inspections I require digital pictures of the roof at tear off and showing the ice barrier. Usually I get way more pics than I need. The pictures is a common practice in this area. I DO NOT go up on the roof except in special instances. I also do a final inspection. We have had a lot of hail storms this summer. We did 255 re-roof permits in August just in the rural areas of the county. The cities in the county did way more than that.

Joe
 
Thanks to all that posted. We are trying to figure out if we should, or should not require a permit. And the level of inspections. Thanks again.
 
We do....up a ladder or on the roof if needed at "roof start" see I&W, nailing and underlayment...amazing what guys don't know...It is no guarantee that the roof will be done perfectly, but hopefully eliminates a bunch of issues.... saw a kid the other day nailing his architectural shingles about 2" down from the top!!! How hard is it to read the package, and who the heck did he learn that from?????

We have a town nearby that makes contractors strip the bottom 3' on a recover to put I&W on at that point....!!!!!
 
We do what mn joe does except tear-off only required at 3rd layer. We require I&WS on tear-offs (if not existing) and new construction only.
 
Greetings,

What I've found to be spooky is when these guys reroof and knock the gas flue pipes loose and are no longer terminated in the roof jack. Lo and behold they don't get fixed and there ya go, combustion gases in the attic.

BS
 
We require permits. Three inspections required. tear-off to look at condition of decking requiring repair as needed, in progress, underlayment,flashing etc. and a final
 
Permit required if changing type of roofing and tearing-off two layers.

Like for like for second layer, no permit required.

I do a pre-inspection, mid-inspection, and a final. Yes, I do get up on the roof if under 5 and 12. It's amazing some of the nailing patterns that I have seen.
 
Pcinspector1 said:
We had a homeowner installing a 3-tab over two 3-tabs and one wood shake roof, Chief said go get'emNo double shingled roofs allowed here, complete tear-off

pc1
Had one with 4 layers - 1 wood shake, 1 wood shingle, topped with two layers of comp. I could hear the house sigh with relief when they did the tear-off. :)
 
Top