The service drop was laying on the roof so they propped it up.
The roof pitch is 7/8" so the last roof was a hot mop. That roofer didn't prop the drop before throwing hot tar. It's hard to know what that did to the insulation.
The roof pitch is 7/8" so the last roof was a hot mop. That roofer didn't prop the drop before throwing hot tar. It's hard to know what that did to the insulation.