I have an existing building, approx. 5,500 sq. ft. in size. An existing dentist wants to completely
separate the building into two separate buildings and then bring in another dentist in to the
newly created part. Kinda like a zero lot line set-up. This existing building IS located within
a designated floodplain.
I would like to get input on the various code sections & NEC articles that would apply. I have
started a list from the NEC, IPC and the IBC. The mechanicals are obvious. No plans have
been submitted. The existing dentist is fishing for information on what is actually required.
The dentist moving in WILL have anesthetizing capabilities, so I'm all over Article 517 & 700.
What say ye?
.
separate the building into two separate buildings and then bring in another dentist in to the
newly created part. Kinda like a zero lot line set-up. This existing building IS located within
a designated floodplain.
I would like to get input on the various code sections & NEC articles that would apply. I have
started a list from the NEC, IPC and the IBC. The mechanicals are obvious. No plans have
been submitted. The existing dentist is fishing for information on what is actually required.
The dentist moving in WILL have anesthetizing capabilities, so I'm all over Article 517 & 700.
What say ye?
.