For the below shown situation, what's the minimum horizontal and vertical clearance required between the OH conductors and/or mast and a PVC radon pipe that would extend 12" beyond the roof line (going around the eave, not through).
Prior to the SE being moved, a radon pipe went up and around the eave just left of the vertical gutter drain pipe.
2017 NEC reference would be great... did not see it in 230.9 or 230.24.
Thank you!
Prior to the SE being moved, a radon pipe went up and around the eave just left of the vertical gutter drain pipe.
2017 NEC reference would be great... did not see it in 230.9 or 230.24.
Thank you!