jar546
CBO
A few questions for those that have inspected these systems and have systems in place.
1) How often were they spec'd out as part of the HVAC system (allowed) rather then a separate system?
2) Who performs the annual inspections that are required?
3) Is the required backup power part of the required annual inspection?
1) How often were they spec'd out as part of the HVAC system (allowed) rather then a separate system?
2) Who performs the annual inspections that are required?
3) Is the required backup power part of the required annual inspection?