Forest
Bronze Member
Is a disconnect required for DC conductors on building "A" that array is located?
5kw solar array mounted on roof of structure "A".Inverter,DC disconnect,AC disconnect,meter and panel located on building "B"(array for building "B").DC wiring from array on roof goes down side of building "A" enters under floor in basement continues total length of basement were it leaves basement wall underground to building "B"approx. 100'.DC disconnect located with in site from building "A".
5kw solar array mounted on roof of structure "A".Inverter,DC disconnect,AC disconnect,meter and panel located on building "B"(array for building "B").DC wiring from array on roof goes down side of building "A" enters under floor in basement continues total length of basement were it leaves basement wall underground to building "B"approx. 100'.DC disconnect located with in site from building "A".