Inspector 102
REGISTERED
A building has an exterior corridor between 2 buildings to an entry door. The owner would like to put a roof assembly over this for weather protection (rain and snow). Both sides of the corridor are cement block and brick construction. Both buildings are fully sprinklered. The roof assembly they have proposed will be PT lumber stringers and purlins with a standing seam metal roof membrane.
I seem to remember that there are provisions for sprinkler omissions where these area are not used for storage. Since this is simply an entrance "corridor", I think this might be acceptable. Otherwise there will need to be a dry pipe sprinkler installed due to the exterior location and the winter environment here.
Is there an exception based on material or size that would be applicable for this type of situation. Thank you.
I seem to remember that there are provisions for sprinkler omissions where these area are not used for storage. Since this is simply an entrance "corridor", I think this might be acceptable. Otherwise there will need to be a dry pipe sprinkler installed due to the exterior location and the winter environment here.
Is there an exception based on material or size that would be applicable for this type of situation. Thank you.