Mech
REGISTERED
2009 IBC & IMC
Group R-2, Type 5B construction, 3 story building
Is ventilation required in a fire-rated stairwell? Pressurization / smoke control is not required per sections 403 & 405. I am not 100% on the lingo, but this might be an exit access stairs because the occupants must leave the stair tower and enter a corridor on the level of discharge prior to getting out of the building.
The second stair tower opens to the exterior and can claim natural ventilation (if ventilation is required.)
Thanks in advance?
Group R-2, Type 5B construction, 3 story building
Is ventilation required in a fire-rated stairwell? Pressurization / smoke control is not required per sections 403 & 405. I am not 100% on the lingo, but this might be an exit access stairs because the occupants must leave the stair tower and enter a corridor on the level of discharge prior to getting out of the building.
The second stair tower opens to the exterior and can claim natural ventilation (if ventilation is required.)
Thanks in advance?