A DOJ inspector has just flagged several locations on my project where the standpipe valves project more than 4 inches into the path of travel on the stair landings. Has anyone else ever encountered this? How did you solve it? The best I can think of is to run small sections of cane rail around the base of the standpipes. It's hard to find a one-size-fits-all approach because almost every landing has a different standpipe condition.