• Welcome to the new and improved Building Code Forum. We appreciate you being here and hope that you are getting the information that you need concerning all codes of the building trades. This is a free forum to the public due to the generosity of the Sawhorses, Corporate Supporters and Supporters who have upgraded their accounts. If you would like to have improved access to the forum please upgrade to Sawhorse by first logging in then clicking here: Upgrades

Strobe height after manufacturing installation

bstammeyer

Registered User
Joined
Mar 4, 2019
Messages
1
Location
Iowa
I have an occupancy in my city that was converted from a Menards (home improvement) to a small manufacturing plant for a specific product line. Besides dividing the floor into separate assembly lines the main area has not been partitioned.

Was looking for direction in either NFPA72 or the IFC to determine at what point they need to increase the height of their strobes. Thank you for your assistance.
 
I would say they don’t

Add or move if blocked

Plus max ceiling height is thirty feet
 
Last edited:
Top