So, I have a situation, asked to come in and review a site, it's an indoor archery range for a private club, being built by the membership, all volunteers.
PreFab Metal building with 2x4 wood studded walls spaced away from the metal framework, on 24" C/L for Rockwool batts, the batts they are looking to use are the R-23 5.5" deep.
So, 3.5" stud with 5.5 batts, there is enough room depth wise, but part of the batt will go 2" past the 2x4 wood stud.
What's your thoughts on this?
PreFab Metal building with 2x4 wood studded walls spaced away from the metal framework, on 24" C/L for Rockwool batts, the batts they are looking to use are the R-23 5.5" deep.
So, 3.5" stud with 5.5 batts, there is enough room depth wise, but part of the batt will go 2" past the 2x4 wood stud.
What's your thoughts on this?