I would like to get some feedback concerning connecting PV Solar arrays to Main Service Panels that do not have a main disconnect, the 6 handle throw types of services. We do a lot of solar in my region and we've been hearing different opinions concerning 705.12 (A). What we're trying to get clarification on is:
1) Does the disconnecting means of the PV system count as one of the "six" handle throws, since technically, the disconnecting means for a PV system is not a service disconnect, as "service" is defined in Article 100?
2) Should the sum of the amperage ratings of all six disconnects, including the PV disconnecting means, be limited to the amperage rating of the service/bus?
Some folks are saying that, Yes, the PV disconnect is counted as one of the "six" disconnects, or "handle throws" and that it's amp rating needs to be added to the amp rating of the other 5 disconnects, and that sum shall not exceed the rating of the panel.
Other folks are saying that, No, the PV disconnect is NOT counted as one of the "six" disconnects, or "handle throws", and that it does not matter what the sum of the six disconnects are rated at. If the service panel is rated for 200 Amps, then the PV disconnect added to the service could be as large as 200 Amps, for example.
I will try to check back once a day to see what kind of comments have been added. Any published literature from recognized professionals concerning solar connections would be welcomed, as well. Thanks!
1) Does the disconnecting means of the PV system count as one of the "six" handle throws, since technically, the disconnecting means for a PV system is not a service disconnect, as "service" is defined in Article 100?
2) Should the sum of the amperage ratings of all six disconnects, including the PV disconnecting means, be limited to the amperage rating of the service/bus?
Some folks are saying that, Yes, the PV disconnect is counted as one of the "six" disconnects, or "handle throws" and that it's amp rating needs to be added to the amp rating of the other 5 disconnects, and that sum shall not exceed the rating of the panel.
Other folks are saying that, No, the PV disconnect is NOT counted as one of the "six" disconnects, or "handle throws", and that it does not matter what the sum of the six disconnects are rated at. If the service panel is rated for 200 Amps, then the PV disconnect added to the service could be as large as 200 Amps, for example.
I will try to check back once a day to see what kind of comments have been added. Any published literature from recognized professionals concerning solar connections would be welcomed, as well. Thanks!