The job is creating a bathroom between two second floor bedrooms. Back to back closets have been eliminated to provide the space for the bathroom.
The first inspection was for the plumbing.
Not long into it I noticed that the joist under the missing wall is 5-- 2"x10"s. I couldn't help but wonder why. The contractor was no help......until I asked him to remove an area of drywall from the lid. That's where I found this:
The first inspection was for the plumbing.
Not long into it I noticed that the joist under the missing wall is 5-- 2"x10"s. I couldn't help but wonder why. The contractor was no help......until I asked him to remove an area of drywall from the lid. That's where I found this: