mshields
Silver Member
If a 3 phase, 4 wire feeder is brought to a load that only requires 3 phase, 3 wire, is there anything in the code prohibitting one from taping the extra conductor in the panel (i.e. at the source) and then at the disconnect (i.e. at the load) and just leaving it hanging so to speak?