cheyer
REGISTERED
I have an existing hotel that is using the electrical/mechanical room as office space.
I have addressed the obvious electrical concerns (open j-boxes, etc.), clearance issues, and have involved the building department due to the new furnaces for the HVAC being in there, and possibly other permitting issues......if you have encountered similar situations, what have you required or not allowed? I could not find, thus far, any code language to not allow them to do so. The hotel is sprinkled and does have a f/a system.
Thanks.
I have addressed the obvious electrical concerns (open j-boxes, etc.), clearance issues, and have involved the building department due to the new furnaces for the HVAC being in there, and possibly other permitting issues......if you have encountered similar situations, what have you required or not allowed? I could not find, thus far, any code language to not allow them to do so. The hotel is sprinkled and does have a f/a system.