mh1
REGISTERED
Hello, thanks in advance for feedback: I have a 10k sf currently empty space proposed to fill with about 30 M occupancy rooms defined by partial walls that stop 18 inches (or more) below sprinkler deflectors. My question here is only about airflow. Current two RTUs feed the space with short distribution trunks. What considerations, if any, are there about air feed ducts or returns from the space? Since the tops of all walls are open, is there no consideration? Or does each space need air supply and/or return?