jar546
CBO
I remember back in 2008 when I took the commercial plumbing inspector then plans examiner certifications that the tables were set up to use the map figures to determine the amount of gpm based on square footage. When I look at the storm drainage section today I don't see a formula listed or a table that helps determine the gpm. Maybe I am missing something but in order to do plan review, I had to look up a formula to determine gpm based on square footage and rainfall amount. What I came up with was GPM= .0104(constant) x Roof Area (sq ft) x Rainfall (1 hr per figures)
Am I missing something here? In the past I believe this was simplified and now I had to look up a formula. How rusty am I?
Am I missing something here? In the past I believe this was simplified and now I had to look up a formula. How rusty am I?