• Welcome to the new and improved Building Code Forum. We appreciate you being here and hope that you are getting the information that you need concerning all codes of the building trades. This is a free forum to the public due to the generosity of the Sawhorses, Corporate Supporters and Supporters who have upgraded their accounts. If you would like to have improved access to the forum please upgrade to Sawhorse by first logging in then clicking here: Upgrades

What do you mean a few rocks weigh much???

It is amazing how much water weighs isn't it? The dirt along with having enough but when you add all the water that fell and soaked into it it became the proverbial straw that broke the camels back! Hopefully the contractor doing the pool work had the project engineer calculate the possibilities but I'm betting he didn't!

I know the situation many years ago where it's one pool built on the 5th floor of a large corporate recreation center. The problem was that the designers forgot to take into account the water weight that would be in the pool when they designed the building! As a result the pool was never used and a large portion of the building with never used.
 
Top