California has rules about what license it takes to pull a permit. Without getting into all of the details, the idea is to have a licensed electrical contractor perform el work, mechanical contr. for mechanical work etc. A general building contractor can pull any and all permits within certain guidelines. The way it is set up, the GC must have a building permit and then is allowed to pull other trades permits as long as they are not related to the building permit and there must be at least two unrelated trades.
Well here is a typical outcome. There is a building permit to drywall the garage, an electrical permit to install two GFCI in the kitchen and one GFCI in each bathroom and a mechanical permit to replace a furnace.
The kitchen and bathrooms already had GFCI and the garage has been drywalled since the house was built 20 years ago. No work is planned.
So it's the furnace that this job is all about.
The condensate drain pipe was cut off so that the furnace could be installed below the existing coil.
When I asked the contractor why he didn't restore the condensate drain pipe he said; "That is the way we found it."
I voided all of the permits on the basis that the building and electrical permits are a ruse to qualify for the mechanical permit.
The contractor argued that the rules do not say that any work must be done, only that the permits exist.
I couldn't help but smile and wonder, just how stupid does he think I am?
I can already hear many of you saying, "Big deal! It's just a furnace, write the correction to fix the pipe and move on." ICE can't go with the flow, that's WATER.
Well here is a typical outcome. There is a building permit to drywall the garage, an electrical permit to install two GFCI in the kitchen and one GFCI in each bathroom and a mechanical permit to replace a furnace.
The kitchen and bathrooms already had GFCI and the garage has been drywalled since the house was built 20 years ago. No work is planned.
So it's the furnace that this job is all about.
The condensate drain pipe was cut off so that the furnace could be installed below the existing coil.
When I asked the contractor why he didn't restore the condensate drain pipe he said; "That is the way we found it."
I voided all of the permits on the basis that the building and electrical permits are a ruse to qualify for the mechanical permit.
The contractor argued that the rules do not say that any work must be done, only that the permits exist.
I couldn't help but smile and wonder, just how stupid does he think I am?
I can already hear many of you saying, "Big deal! It's just a furnace, write the correction to fix the pipe and move on." ICE can't go with the flow, that's WATER.

Last edited by a moderator: