• Welcome to the new and improved Building Code Forum. We appreciate you being here and hope that you are getting the information that you need concerning all codes of the building trades. This is a free forum to the public due to the generosity of the Sawhorses, Corporate Supporters and Supporters who have upgraded their accounts. If you would like to have improved access to the forum please upgrade to Sawhorse by first logging in then clicking here: Upgrades

Zero Pitch and Under....

JamesAlpha

Registered User
Joined
Aug 11, 2016
Messages
5
Location
Austin
Is there a code that states mod bit is required when the pitch is zero and below? If so, where can I find it? Thank you
 
1507.11 Modified bitumen roofing.
The installation of modified bitumen roofing shall comply with the provisions of this section.

1507.11.1 Slope.
Modified bitumen membrane roofs shall have a design slope of a minimum of one-fourth unit vertical in 12 units horizontal (2-percent slope) for drainage.

1507.11.2 Material standards.
Modified bitumen roof coverings shall comply with CGSB 37-GP-56M, ASTM D 6162, ASTM D 6163, ASTM D 6164, ASTM D 6222, ASTM D 6223, ASTM D 6298 or ASTM D 6509.
 
1/4 or maybe 1/8 might be the least pitch per code for any roofing...Not sure what zero pitch would be and there is no such thing as negative pitch....
 
1507.11 Modified bitumen roofing.
1507.11 Modified bitumen roofing.
The installation of modified bitumen roofing shall comply with the provisions of this section.

1507.11.1 Slope.
Modified bitumen membrane roofs shall have a design slope of a minimum of one-fourth unit vertical in 12 units horizontal (2-percent slope) for drainage.

1507.11.2 Material standards.
Modified bitumen roof coverings shall comply with CGSB 37-GP-56M, ASTM D 6162, ASTM D 6163, ASTM D 6164, ASTM D 6222, ASTM D 6223, ASTM D 6298 or ASTM D 6509.
$ * $ * $


Welcome JamesAlpha to The Building Codes Forum ! :cool:


$ * $ * $
Thanks!
The installation of modified bitumen roofing shall comply with the provisions of this section.

1507.11.1 Slope.
Modified bitumen membrane roofs shall have a design slope of a minimum of one-fourth unit vertical in 12 units horizontal (2-percent slope) for drainage.

1507.11.2 Material standards.
Modified bitumen roof coverings shall comply with CGSB 37-GP-56M, ASTM D 6162, ASTM D 6163, ASTM D 6164, ASTM D 6222, ASTM D 6223, ASTM D 6298 or ASTM D 6509.
Zero and below? 2009 IRC 905.2.2 for asphalt shingles 2 pitch or greater.
 
1507.11 Modified bitumen roofing.
The installation of modified bitumen roofing shall comply with the provisions of this section.

1507.11.1 Slope.
Modified bitumen membrane roofs shall have a design slope of a minimum of one-fourth unit vertical in 12 units horizontal (2-percent slope) for drainage.

1507.11.2 Material standards.
Modified bitumen roof coverings shall comply with CGSB 37-GP-56M, ASTM D 6162, ASTM D 6163, ASTM D 6164, ASTM D 6222, ASTM D 6223, ASTM D 6298 or ASTM D 6509.
Thank you for your help!
 
There are choices beyond modified bitumen. Is the the job new construction or a re-roof? The 1/4" minimum slope rule does not apply to a re-roof.
 
If you have 0 they need to re-slope with crickets or something. Anything less than 2:12 requires a low slope roofing applications. R903 requires roof drainage. R904.3 requires materials to meet characteristics of roof and refers you to the code or ASTM standards for type of materials.

Sorry 2009 IRC
 
Top