steveray
SAWHORSE
IRC floor cantilever bearing wall and roof above. Meets the prescriptive table in Chapter 5. The only issue I have is that the framer used a double rim joist at this location. So the bearing wall above only catches about 1/2 inch of the joists and other than that is sitting on the rim supported by end grain nails to the joists.....Anybody else have an opinion on this or a solution? Thanks!