San Francisco Chronicle said:The discovery of a cracked steel beam that forced the abrupt closure Tuesday of the brand-new Transbay Transit Center is the latest headache for the $2.2 billion transportation hub, which has been plagued by glitches and cost overruns since its inception.
The cracked beam was spotted Tuesday morning by workers installing ceiling panels on the center’s third-floor bus platform, and concern over its potential failure prompted city officials to close the terminal and some streets at 4:30 p.m. They shunted rush-hour commuters to the nearby Temporary Transbay Terminal, which had been used during the center’s construction.
The center sits next to the troubled Millennium Tower, which has sunk 18 inches since it opened in 2009. The damaged beam at the transit center was discovered on the same day that engineers inspected a cracked window on the tower, in an attempt to determine if it’s related to building’s sinking and tilting.¹
The city building department didn’t build anything. A phalanx of high profile engineers petitioned the building department for a permit based on the best engineering available. The building department engineers approved the plans that respected engineers created. The high profile engineers screwed up.In addition to the tower settling the adjacent TransBay terminal has cracked beams and has been shut down,
Years of delays in plan check and millions of dollars in plan check fees and the city building department has screwed up on both buildings,
¹ https://www.sfchronicle.com/bayarea...l-beam-found-at-Transbay-Transit-13257805.php
In addition to the tower settling the adjacent TransBay terminal has cracked beams and has been shut down,
Years of delays in plan check and millions of dollars in plan check fees and the city building department has screwed up on both buildings,
¹ https://www.sfchronicle.com/bayarea...l-beam-found-at-Transbay-Transit-13257805.php
I'm not sure how additional, or even the required, inspections would've helped anything, seeing as how an inspector can't possibly be expected to know all the codes he's enforcing.....
Jar said:ANYONE that has spent any time in the field as a contractor can tell you that they have seen corners cut when there was no permit or inspections on a job. It is just like all of the problems we see in other countries that don't have a solid inspection process. They have full access and ability to adopt codes and build to a standard but in the absence or enforcement, they don't. Profit wins every time.
.................I do know that on the entire San Francisco peninsula single family homes take an average of 7 years to permit and permit fees average well over $100,000 per home depending upon the community, ...................."
OMG............my head hurt just reading that drivel..........
At the end of it, it appears that if a developer knows what they are doing, like here, the development side could be done in three to six months as Mark said. Once that is complete, or in some cases, we run them concurrently, the building plan review is 20 working days.
Ya and how many plan checks on one project ... I average two, but have had fiveOMG............my head hurt just reading that drivel..........
At the end of it, it appears that if a developer knows what they are doing, like here, the development side could be done in three to six months as Mark said. Once that is complete, or in some cases, we run them concurrently, the building plan review is 20 working days.
Fatboy:
I agree, I just had a customer build a log home outside of Denver with time frames like that, but this is Calfiornia, we can't get the Design Review hearings scheduled in 20 working days. As I've mentioned a few times a construction defects attorney friend sold his home here and built a new one in no time at all in Nevada, his architect handled his inspections for a lot less that the county would have charged, permit fees were only $3,000 and would have been over $100,000 here.
One trick we all use to get around the bastards here is to leave a portion of an old home up and get classified as a "remodel" rather than new construction, here is one I did that way, it costs a lot more to work around the old crap, in this case a lot more because we ran into a lot of dry rot, I got this through in two years by doing that but it probably cost my owner a million dollars more money. During construction a Mexican American carpenter came to me complaining that his architect was 7 years into permitting two new houses in South San Francisco, he asked about suing for racial discrimination since I was able to do it in two years, I told him no that if anything they would be very careful with him because of his situation, I offered to look into it for him and found his architect had it all down to a fight between the fire marshals and the water district over the number of water meters for each house.
BTW, as you can see there were 50 pages of plans submitted, in addition I submitted 75 pages of shop drawings which accounted for the bulk of the several months of plan review. As you can see only the well-to-do can afford to live in code-compliant buildings now, cities like Oakland can provide can provide non-code-compliant housing for the rest of us.
For fun... on the plans you posted, our fees are as follows:
Building Permit: 3'195.00
Building Bond: 2'000.00
Water Permit: 750.00
Sewer Permit: 500.00
Zoning Variance: 250.00
Total: 4'695.00 in fees and 2'000.00 bond refunded once the final inspection is completed.
I am under the presumption that most places in North America are more like us than like California, so if it's that hard to get the permits, the fees are so high, etc. then why are people still trying to do it? The answer is quite simple: because it is worth it to these people. People don't pay for/do things unless it meets with their needs or wants. Places can charge that much because that is what it is worth to their residents.
I guess my point is that they choose to live there. We've all heard stories of people who ask for money on the streets and are offered minimum wage jobs that they turn down because they make more money on the street. Many of the people who can't afford a home in these cities could afford one in others. The people who are living in tents, vans, and sheds are living there because their desire to live in that city is greater than their desire to own a home.It's fine for people like this who make millions of dollars per year, in fact high fees keep the "riff rap" out, but what about all the poor people living in the streets or those Tuff Sheds that don't need permits? We have arrived at a point where only the rich can afford a code compliant home so the lower classes live in homes that don't comply with code?
Ya and how many plan checks on one project ... I average two, but have had five
Again and again; same comments....One plan check for building, we redline comment the plan, and return. Its up to the design team/contractors to read comments.
Missing the point gang, the developer "chose" the foundation system knowing the nature of the underlying soil was/is suspect. The "city" then reviewed and accepted the design vs saying no to it.
In order to reject an application there must be code provisions upon which to base the rejection.
What provision in the IBC would have predicted the failure and could have served as the basis of the rejection?
I will suggest that most of those on this forum have not read Chapter 18. The reality is that there are no technical provisions related to the evaluation of settlement. The code requires that certain information be reported but the code has no criteria to reject the design as long as the information is reported.