jar546
CBO
If you have a generator that runs in 1-1/2" PVC Schedule 40 underground, then transitions to Schedule 80 PVC where it emerges from the ground and goes to the ATS, can you run four 1/0 copper THWN-2 conductors in that 1-1/2" PVC? This is an issue for sizing conduit and nothing else.