For a Level 2 renovation of a condo in a type II building they moved some walls and now the main panel requires a junction box that transitions from EMT that was using the EMT as the equipment grounding conductor EGC. In order to extend it they P-Tapped the 3 conductors and added a bonding bushing to the EMT entering the PVC JB in order to provide the continuance of the EGC to the new/moved main panel. Again, this is a feeder to a main panel, not service conductors. Thoughts other than an access panel in the middle of the ceiling?