VinceCh
REGISTERED
NYCBC 1968.
In this instance, a 2-floor expansion is proposed to a 3 floor building. The current 3rd floor has egress deficiency. So in order to add an exit, we are proposing to exit out of the third floor across the new roof (paved and roofed walkway) of the 2nd floor to a new exterior stair that discharges to a public way. The building is fully sprinklered, the exterior wall separating the 3rd floor from the walkway is 2 HR protected. Our local building official is challenging this interpretation. Any thoughts?
In this instance, a 2-floor expansion is proposed to a 3 floor building. The current 3rd floor has egress deficiency. So in order to add an exit, we are proposing to exit out of the third floor across the new roof (paved and roofed walkway) of the 2nd floor to a new exterior stair that discharges to a public way. The building is fully sprinklered, the exterior wall separating the 3rd floor from the walkway is 2 HR protected. Our local building official is challenging this interpretation. Any thoughts?