Tim Mailloux
REGISTERED
Say you have a level 2 alterations under the IEBC, as long as you don’t increase the occupant load by more than 20% under the renovation you don’t have to bring the plumbing fixture counts up to current code. What if you decide to completely demolish the existing toilet rooms under the renovation and rebuilt them new. Do these new toilet rooms need to meet new code plumbing counts or would it be acceptable to rebuilt and match the existing plumbing fixture count?