I cannot seem to find a listed head of wall detail for a 1 hour rated fire barrier partition that terminates into a wood framed plywood deck roof. Very common condition, but I cannot find one. We can notch the gyp around the purlins and take it to the deck, or perhaps use a fire safing material to span the 5.5" gap from the underside of purlin/top track connection to the deck. Open to either option, just would like to see a listed detail. The wall is a UL 419 metal framed wall. Thanks