The GC on this single story tilt project has suggested warping all the steel on the low end of the building in order to save money by not having to have built up insulation crickets. Does this seem like a cost saving measure or just a huge headache to get the placement of the embed plates and joists just right? The structural engineer is very weary of this tactic and would prefer not to do it. He does not see this as a cost savings taking into account the extra roof drains that we need on either end of the building and any other erection problems we might face. Has anyone ever used this approach and what was the outcome?