We have an existing building that we have to run through COMcheck for our local jurisdiction, which requires R13+R3.8 CI. The building is currently uninsulated framed walls, with sheathing and brick on the exterior. Since we're opening up the walls, and the walls currently have no insulation, there are no exceptions that apply, so we have to install insulation.
So the question is, can the continuous insulation go on the INTERIOR side of the framing, before gyp board? Because we're definitely not going to be removing all the brick veneer just to add a single layer of continuous insulation on this thing.