Construction Update

jar546

CBO
Joined
Oct 16, 2009
Messages
13,014
Location
Not where I really want to be
Preparing for the concrete slab.
Piling are complete
All grade beams are poured
Electrical and plumbing underground getting there
Stem walls up and poured solid
Backfill getting underway so the UG E&P could be completed and slab poured.

What do you see?

IMG_2973.jpeg
 
@ ~ @

Some of the grade beam, vertical pieces of rebar have been run

over and bent significantly,
The orange colored, impalement protective caps seem to be
"not in good shape" \ old,

pieces of rebar missing the impalement protective caps

# + # +
 
Pretty blue sky.
No anchor bolts. I guess that’s not needed because the rebar ties it together.
Vapor barrier under the slab?
What is the finished height of the slab? Flush with top of cmu? 3” over cmu? how are they forming the bottom side of the slab?
 
The bent vertical rebar caught my eye, but the detailed drawings you provided make it clear the intent is to have a turn-down that bears on top of the grade beam and is not tied into the stem walls; thus, the reason the rebars are exposed.

I assume the top of the slab will be at the same elevation as the top of the stem walls, and the void under the slab will be backfilled with engineered fill.
 
That looks like regular soil as opposed to Florida sand. It seems odd that the slab will be independant from the CMU stem wall. What is the reason for that?


IMG_2973.jpeg
 
The stem walls and subsequent walls above will have their own reinforcing. The reinforcing outside the stem walls is only for the slabs, which will have turndowns that bear directly on the grade beams. The slabs and their turndowns will have no connection to the stem walls other than the bonding of concrete to the CMU. Thus, the reinforcing is where it needs to be to connect the slab to the grade beams.
 