I'm looking - so far unsuccessfully - to determine what if any egress is required from what I call a rigging pit or some call an arbor pit. It is a recess in a stage wall - to left or right - to allow the counterweight of rigging system to lower into.
In a building with a basement, there basement depth and a door. In a building otherwise on grade, they might only be 4 to 5 feet deep.
I'd guess someone might go there once or twice a year. A technician once for recommended annual inspection and service, only other times to retrieve something that has been dropped, like work gloves or notes and pencil. I'd guess many have never been visited after initial installation.
A technician would bring a ladder. Does IBC otherwise require egress and if so, what? I've seen quite a few that don't have egress.
Thanks!
At the bottom of figure.

In a building with a basement, there basement depth and a door. In a building otherwise on grade, they might only be 4 to 5 feet deep.
I'd guess someone might go there once or twice a year. A technician once for recommended annual inspection and service, only other times to retrieve something that has been dropped, like work gloves or notes and pencil. I'd guess many have never been visited after initial installation.
A technician would bring a ladder. Does IBC otherwise require egress and if so, what? I've seen quite a few that don't have egress.
Thanks!
At the bottom of figure.