I am looking at providing a small IIIB project and based on table 601 and 704.10/704.11 it appears as though an overhead door lintel would be required to be 2 hour rated.  So if we have a 14' overhead door, the lintel at that opening would need to be 2 hour rated.  While i guess i could opt for a type V construction, it got me wondering how most IIIB buildings would handle this. Not a huge fan of intumescent paint. precast?
	
		
			
		
		
	
				
			 
	 
 
		 
 
		