ExchangeOR
REGISTERED
Wow! Great forum rich with knowledge and insight.
I have a commercial property that I am making repairs to. Structure is stuck built from the 1960s. Type V.
South wall (parallel to lot line) is > 3’ and < 5’ from said property line.
Historic occupancy was A.
Building official is requesting a 2hr fire rated wall assembly. Looking at IBC tables 601 & 602,I deduce that this is due in part to the no longer accurate occupancy.
Is this correct and if I change occupancy to B or R or S can I go to 1hr or less?
Thanks for helping a residential guy enter the commercial world
I have a commercial property that I am making repairs to. Structure is stuck built from the 1960s. Type V.
South wall (parallel to lot line) is > 3’ and < 5’ from said property line.
Historic occupancy was A.
Building official is requesting a 2hr fire rated wall assembly. Looking at IBC tables 601 & 602,I deduce that this is due in part to the no longer accurate occupancy.
Is this correct and if I change occupancy to B or R or S can I go to 1hr or less?
Thanks for helping a residential guy enter the commercial world