Hawaii County Structural is asking for a 5.5" gap between existing building and outdoor eating lanai. Engineer is asking how to redesign for add criteria.
Research suggest using double beam which seams costly or a Flexible Joint system. What is the typical solution? There is a 12' doorway at the existing building out onto
the lanai addition with a long step to accommodate height needs for outer lanai roof slop. Photos may allow for better understanding.
Research suggest using double beam which seams costly or a Flexible Joint system. What is the typical solution? There is a 12' doorway at the existing building out onto
the lanai addition with a long step to accommodate height needs for outer lanai roof slop. Photos may allow for better understanding.