• Welcome to The Building Code Forum

    Your premier resource for building code knowledge.

    This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.

    Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.

    Ready to upgrade? Log in and upgrade now.

2018 ibc

  1. G

    2018 IEBC - Performance Evaluation of mixed-occupancy building

    This pertains to a small, three-story building. The proposal is to convert the upper two stories into separate R-3 units (that is, one dwelling unit per level). To do this we are doing a performance evaluation per chapter 13 of the IEBC. We can attain the necessary points with no sprinklers...
  2. B

    Enclose Existing Outdoor Stair - Using Existing Framing

    Hi, all. Looking for some insight on the flexibility of the 2018 IEBC and 2018 IBC. The project has 5 exterior wood stairs that each serve three stories and 6 apartments units (30 total apartment units). The building was originally built early 1900's and also has an interior stair at the front...
Back
Top