• Welcome to The Building Code Forum

    Your premier resource for building code knowledge.

    This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.

    Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.

    Ready to upgrade? Log in and upgrade now.

110.27(B) EV Station

Francis Vineyard

REGISTERED
Joined
Jan 1, 2010
Messages
3,105
Location
Charlottesville, VA
For what distance if wheel stops are sufficient and how about requirements for equipment mounted on bollards?

ChargingStation.jpg


Francis
 
At least one needs to meet ADA. So at least one will never be used. Why would anyone bother to build something that won't be used?

As far as wheel stops are concerned, the vehicle wheels will never touch the stops as it is drawn. Wheel stops should be as far away as any pick-up truck may require, front or back. However, wheel stops are not to be considered protection for the equipment....protection would require bollards.
 
Last edited by a moderator:
Just had a DRP livid cause the installed a charging system called "JUICE BAR" and it was rejected and removed because..

per our electrical inspector not one component of the assembly had a listing or was part of an assembly..

the basically built it from shelf parts and set it up.

have another propsal for a Solar Panel (canopy mounted above parking spots) generated charger ... the DRP took offense when I SUGGESTED it be taller

to avoid snow plow impact with the overhead? he didn't think any thing taller than a pick-up would be used??

Municipal Lot in the public works area so I suggested he guess agin at vehicle height,
 
Back
Top