skipharper
REGISTERED
A sump flush to the finished floor is located directly in front of an electrical panel 6" off wall-is this in the working clearance space for the panel?
Your premier resource for building code knowledge.
This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.
Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.
Ready to upgrade? Log in and upgrade now.
metal cover?fatboy said:if there were ... a flush top, i think you would have to accept it............
Pipe might be the violation in that one...but the cover looks OK...mark handler said:metal cover?![]()
So your going to stand on a metal plate and stick your hand into the panel? A braver man than I Gunga Din...steveray said:Pipe might be the violation in that one...but the cover looks OK...
It's all about the PPE....You are sticking your hands in a live panel after all....Should we not put panels in steel buildings?mark handler said:So your going to stand on a metal plate and stick your hand into the panel? A braver man than I Gunga Din...
Who said steel Building?steveray said:... in steel buildings?
Steel cover, steel deck floor, wood framed warehouse with steel plates on the floor, concrete floor with steel in it....I don't know that electricity cares what you are standing on if you do something dumb....See BB post...mark handler said:Who said steel Building?