Your premier resource for building code knowledge.
This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.
Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.
Ready to upgrade? Log in and upgrade now.
So, will the R-value Zip sheathing get you there? I personally prefer the R-9, but they make an R-6 also.How is everyone dealing with the requirements for insulation when it comes to the R value of 20 + 5ci in the stud cavity. Adding that 5ci is putting a big cost on construction. If you use rock wool at 5.5" it is just R-23
How is everyone dealing with the requirements for insulation when it comes to the R value of 20 + 5ci in the stud cavity. Adding that 5ci is putting a big cost on construction. If you use rock wool at 5.5" it is just R-23
Ya know, I wonder why Joe didn’t think of that?It's a code requirement. People around here deal with it by doing it.
And you have to buck out all the windows for nailing and deck ledgers get weird with ZipR...And you can't do IRC portal framesZip-R6 is cheaper to install than exter. foam because you would still need a WRB, and trim out all the windows to be flush with the protruding insul.
Downside is the stuff (ZIP-R6) has lousy shear values. Needs to be fastened at 4" OC to get any shear at all.
Yeah you need to break it at the ledger, I copied one of the manuf's details- didn't seem too terrible, we will see how it holds up. The contractor is the one who pushed for the ZIP-R so it must be easier/cheaper. Some struct. engineers are insisting on a layer of sheathing against the studs, then ZIP-R over that. That's how crap it is in shear. (Saw this for Colorado-high wind area)And you have to buck out all the windows for nailing and deck ledgers get weird with ZipR...And you can't do IRC portal frames