I am asking this question for the Zoning Enforcement Officer in our small department. I do not do Zoning.
We currently do not require A-2 surveys for anything other than new construction. We accept almost anything for everything else, including hand drawing on copies of past surveys or sub-division maps, septic as-builts and GIS maps (which are not that accurate) from our town website. We essentially take the applicant's word for it that they are sketching out an accurate depiction of what they intend to build.
The new ZEO thinks we should require accurate surveys for additions and in-ground pools and I agree. We are considering continuing what we have been doing for most other portable sheds, above ground pools and propane tanks, perhaps requiring an accurate survey if it appears the improvement will be closer than within twice the required setback.
What are other towns requiring? For reference, we are in Connecticut. Thanks in advance for your responses!
We currently do not require A-2 surveys for anything other than new construction. We accept almost anything for everything else, including hand drawing on copies of past surveys or sub-division maps, septic as-builts and GIS maps (which are not that accurate) from our town website. We essentially take the applicant's word for it that they are sketching out an accurate depiction of what they intend to build.
The new ZEO thinks we should require accurate surveys for additions and in-ground pools and I agree. We are considering continuing what we have been doing for most other portable sheds, above ground pools and propane tanks, perhaps requiring an accurate survey if it appears the improvement will be closer than within twice the required setback.
What are other towns requiring? For reference, we are in Connecticut. Thanks in advance for your responses!